Production Line 154

Engineering, production, delivery and assembly of the steel structure. Wall- and roof cladding, roofing, concrete floors, chequered floor plates,installation of the equipment, architectural works like ceiling, interior walls, doors, tiling, windows and ventilation louvres. The main challenge of this project is that we have to build a complete factory in a very short time period. To make sure that the main building is closed before wintertime, we decided to build big units and hoist them in one total unit, so the building reached its height in one week. After pouring the floors for the finishing of the interior walls, we were able to work on different heights at the same time.

  • LocationStenungsund, Sweden
  • Order value€ 9.109.000
  • Weight1103 tonnes steel
  • ClientBorealis Zweden

Back to overview

Production Line 154
Production Line 154