Volker Energy Solutions B.V.
Within this project, we delivered approximately 600 galvanized steel poles, finished with a high-performance three-layer coating system. These were manufactured in around 20 different configurations, with lengths of up to 24 meters and diameters up to 460 mm.
Working in a high-voltage environment places exceptionally high demands on quality, safety, and precision. Our processes are fully aligned with these requirements, covering the entire chain from engineering and production to coating, logistics, and installation. Every component is executed in accordance with strict standards and project-specific safety protocols.
The result is a robust and durable steel structure that meets the most demanding technical and safety requirements within energy infrastructure.
Relevant Projects

Supply and installation of the topside structure for the replacement of Jetty 7.

Supply and installation of steel structures, hot-dip galvanized and partially treated with 120-minute fire-resistant coating.

Supply and installation of steel structures, hot-dip galvanized and partially treated with 120-minute fire-resistant coating.